Skip to content

visual-testing

1 post with the tag “visual-testing”

The engine assumed one screen. The job needed four.

I cut a 300-test visual suite from seven hours to under two — on an 8 GB VM that used to fall asleep mid-run. The fast part is the headline. The hard part was that the engine, like almost every visual-automation tool, was built for a single screen. Here’s how I rebuilt isolation on top of it — and how we’re going to make it native.